Built year
2009
Wall material
Brick
Floors
8
Energy efficiency class
Not assigned
House type
Apartment building
Project type
С-222
Emergency status
No
Commissioning year
2009
Living units
17
Non-living units
42
Entrances
2
Elevators
4
Total area
10365,20 м²
Residential area
7182,00 м²
Non-residential area
3183,20 м²
Land area
3803,00 м²
Floor type
Mixed
Wall material
Brick
Foundation type
Other
Basement area
2682,00 м²
Chute type
None
Energy efficiency
Not assigned
Heating
Individual heat substation (IHS)
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at IHS
Ventilation
Supply and exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
Automatic
Drainage
Internal drains
Built year
2009
Wall material
Brick
Floors
8
Energy efficiency class
Not assigned
House type
Apartment building
Project type
С-222
Emergency status
No
Commissioning year
2009
Living units
17
Non-living units
42
Entrances
2
Elevators
4
Total area
10365,20 м²
Residential area
7182,00 м²
Non-residential area
3183,20 м²
Land area
3803,00 м²
Floor type
Mixed
Wall material
Brick
Foundation type
Other
Basement area
2682,00 м²
Chute type
None
Energy efficiency
Not assigned
Heating
Individual heat substation (IHS)
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at IHS
Ventilation
Supply and exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
Automatic
Drainage
Internal drains