Built year
1979
Wall material
Reinforced concrete
Floors
12
Energy efficiency class
D
House type
Apartment building
Project type
П-30
Emergency status
No
Commissioning year
1979
Living units
190
Non-living units
1
Entrances
4
Elevators
8
Total area
11022,00 м²
Residential area
10983,00 м²
Non-residential area
39,00 м²
Land area
0,00 м²
Floor type
Reinforced concrete
Wall material
Reinforced concrete
Foundation type
Strip
Basement area
1254,00 м²
Chute type
On the stairwell
Energy efficiency
D
Heating
Central
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Supply and exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
None
Drainage
Internal drains
Built year
1979
Wall material
Reinforced concrete
Floors
12
Energy efficiency class
D
House type
Apartment building
Project type
П-30
Emergency status
No
Commissioning year
1979
Living units
190
Non-living units
1
Entrances
4
Elevators
8
Total area
11022,00 м²
Residential area
10983,00 м²
Non-residential area
39,00 м²
Land area
0,00 м²
Floor type
Reinforced concrete
Wall material
Reinforced concrete
Foundation type
Strip
Basement area
1254,00 м²
Chute type
On the stairwell
Energy efficiency
D
Heating
Central
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Supply and exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
None
Drainage
Internal drains