Built year
2006
Wall material
Reinforced concrete
Floors
18
Energy efficiency class
Not assigned
House type
Apartment building
Project type
И-155
Emergency status
No
Commissioning year
2006
Living units
278
Non-living units
14
Entrances
4
Elevators
8
Total area
15569,10 м²
Residential area
15111,10 м²
Non-residential area
458,00 м²
Land area
0,00 м²
Floor type
Reinforced concrete
Wall material
Reinforced concrete
Foundation type
Other
Basement area
1403,00 м²
Chute type
On the stairwell
Energy efficiency
Not assigned
Heating
Central
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Supply and exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
Automatic
Drainage
Internal drains
Built year
2006
Wall material
Reinforced concrete
Floors
18
Energy efficiency class
Not assigned
House type
Apartment building
Project type
И-155
Emergency status
No
Commissioning year
2006
Living units
278
Non-living units
14
Entrances
4
Elevators
8
Total area
15569,10 м²
Residential area
15111,10 м²
Non-residential area
458,00 м²
Land area
0,00 м²
Floor type
Reinforced concrete
Wall material
Reinforced concrete
Foundation type
Other
Basement area
1403,00 м²
Chute type
On the stairwell
Energy efficiency
Not assigned
Heating
Central
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Supply and exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
Automatic
Drainage
Internal drains