Built year
1966
Wall material
Monolithic
Floors
5
Living units
100
House type
Apartment building
Project type
I-515
Emergency status
No
Commissioning year
1966
Living units
100
Non-living units
0
Entrances
5
Elevators
0
Total area
4502,00 м²
Residential area
2912,00 м²
Non-residential area
52,00 м²
Land area
0,00 м²
Floor type
Reinforced concrete
Wall material
Monolithic
Foundation type
Strip
Basement area
1073,00 м²
Chute type
None
Energy efficiency
—
Heating
Central
Electrical
—
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Exhaust ventilation
Sewerage
Central
Gas
Central
Firefighting
None
Drainage
—
Built year
1966
Wall material
Monolithic
Floors
5
Living units
100
House type
Apartment building
Project type
I-515
Emergency status
No
Commissioning year
1966
Living units
100
Non-living units
0
Entrances
5
Elevators
0
Total area
4502,00 м²
Residential area
2912,00 м²
Non-residential area
52,00 м²
Land area
0,00 м²
Floor type
Reinforced concrete
Wall material
Monolithic
Foundation type
Strip
Basement area
1073,00 м²
Chute type
None
Energy efficiency
—
Heating
Central
Electrical
—
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Exhaust ventilation
Sewerage
Central
Gas
Central
Firefighting
None
Drainage
—