Built year
1960
Wall material
Other
Floors
2
Energy efficiency class
Not assigned
House type
—
Project type
жилое
Emergency status
Yes
Commissioning year
1960
Living units
12
Non-living units
0
Entrances
2
Elevators
0
Total area
568,30 м²
Residential area
498,30 м²
Non-residential area
0,00 м²
Land area
1009,00 м²
Floor type
Wooden
Wall material
Other
Foundation type
Pier
Basement area
0,00 м²
Chute type
None
Energy efficiency
Not assigned
Heating
Autonomous boiler house (roof / attached)
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Exhaust ventilation
Sewerage
Central
Gas
Central
Firefighting
None
Drainage
Internal drains
Built year
1960
Wall material
Other
Floors
2
Energy efficiency class
Not assigned
House type
—
Project type
жилое
Emergency status
Yes
Commissioning year
1960
Living units
12
Non-living units
0
Entrances
2
Elevators
0
Total area
568,30 м²
Residential area
498,30 м²
Non-residential area
0,00 м²
Land area
1009,00 м²
Floor type
Wooden
Wall material
Other
Foundation type
Pier
Basement area
0,00 м²
Chute type
None
Energy efficiency
Not assigned
Heating
Autonomous boiler house (roof / attached)
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Exhaust ventilation
Sewerage
Central
Gas
Central
Firefighting
None
Drainage
Internal drains