Built year
2008
Wall material
Block
Floors
9
Energy efficiency class
Not assigned
House type
Apartment building
Project type
1/06-ПИР-16-АР
Emergency status
No
Commissioning year
2008
Living units
205
Non-living units
14
Entrances
3
Elevators
3
Total area
13899,20 м²
Residential area
10977,20 м²
Non-residential area
935,00 м²
Land area
9715,00 м²
Floor type
Reinforced concrete
Wall material
Block
Foundation type
Pile
Basement area
177,50 м²
Chute type
On the stairwell
Energy efficiency
Not assigned
Heating
Central
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Exhaust ventilation
Sewerage
Central
Gas
Central
Firefighting
None
Drainage
Internal drains
Built year
2008
Wall material
Block
Floors
9
Energy efficiency class
Not assigned
House type
Apartment building
Project type
1/06-ПИР-16-АР
Emergency status
No
Commissioning year
2008
Living units
205
Non-living units
14
Entrances
3
Elevators
3
Total area
13899,20 м²
Residential area
10977,20 м²
Non-residential area
935,00 м²
Land area
9715,00 м²
Floor type
Reinforced concrete
Wall material
Block
Foundation type
Pile
Basement area
177,50 м²
Chute type
On the stairwell
Energy efficiency
Not assigned
Heating
Central
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Exhaust ventilation
Sewerage
Central
Gas
Central
Firefighting
None
Drainage
Internal drains