Built year
1982
Wall material
Brick
Floors
5
Energy efficiency class
Not assigned
House type
Specialized housing stock
Project type
кирпичный
Emergency status
No
Commissioning year
1982
Living units
64
Non-living units
2
Entrances
1
Elevators
0
Total area
840,70 м²
Residential area
630,50 м²
Non-residential area
0,00 м²
Land area
2772,70 м²
Floor type
Reinforced concrete
Wall material
Brick
Foundation type
Concrete posts
Basement area
517,40 м²
Chute type
None
Energy efficiency
Not assigned
Heating
Central
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
Fire hose reel
Drainage
Internal drains
Built year
1982
Wall material
Brick
Floors
5
Energy efficiency class
Not assigned
House type
Specialized housing stock
Project type
кирпичный
Emergency status
No
Commissioning year
1982
Living units
64
Non-living units
2
Entrances
1
Elevators
0
Total area
840,70 м²
Residential area
630,50 м²
Non-residential area
0,00 м²
Land area
2772,70 м²
Floor type
Reinforced concrete
Wall material
Brick
Foundation type
Concrete posts
Basement area
517,40 м²
Chute type
None
Energy efficiency
Not assigned
Heating
Central
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at CHP
Ventilation
Exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
Fire hose reel
Drainage
Internal drains