Built year
2019
Wall material
Brick
Floors
15
Energy efficiency class
B
House type
Apartment building
Project type
кирпичный
Emergency status
No
Commissioning year
2019
Living units
240
Non-living units
0
Entrances
3
Elevators
6
Total area
15308,15 м²
Residential area
9575,50 м²
Non-residential area
0,00 м²
Land area
6579,00 м²
Floor type
Reinforced concrete
Wall material
Brick
Foundation type
Strip
Basement area
1045,62 м²
Chute type
None
Energy efficiency
B
Heating
Individual heat substation (IHS)
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at IHS
Ventilation
Supply and exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
Fire hose reel
Drainage
Internal drains
Built year
2019
Wall material
Brick
Floors
15
Energy efficiency class
B
House type
Apartment building
Project type
кирпичный
Emergency status
No
Commissioning year
2019
Living units
240
Non-living units
0
Entrances
3
Elevators
6
Total area
15308,15 м²
Residential area
9575,50 м²
Non-residential area
0,00 м²
Land area
6579,00 м²
Floor type
Reinforced concrete
Wall material
Brick
Foundation type
Strip
Basement area
1045,62 м²
Chute type
None
Energy efficiency
B
Heating
Individual heat substation (IHS)
Electrical
Central
Cold water
Central
Hot water
Closed system with hot water prepared at IHS
Ventilation
Supply and exhaust ventilation
Sewerage
Central
Gas
None
Firefighting
Fire hose reel
Drainage
Internal drains